Washburn Tunnel to close nightly Aug. 5-9

The Washburn Tunnel will be closed from 10 p.m. to 4 a.m. daily, beginning Monday, Aug. 5 to Friday, Aug. 9. During that time, Texas Department of Transportation will conduct its biennial inspection, which is required by the Federal Highway Administration for all tunnels within the United States.

Drivers are reminded to use alternate routes during the closure. Alternate routes include I-610 East Loop Freeway, Sam Houston Parkway, and Highway 146.

The Washburn Tunnel is a two-lane underwater roadway connecting Galena Park and Pasadena. Named after Harris County Auditor Harry L. Washburn, the tunnel opened in 1950. It is the south’s largest and first toll-free vehicular tunnel. The site was added to the National Registry of Historic Places in 2008.

For more information and updates on the Precinct, visit www.hcp2.com

Leave a Reply




Bay Area Houston Magazine